City of Burlington fence permit
Do you need a fence permit in the City of Burlington? Yes. The City of Burlington requires a permit before you build a fence.
permit.guide can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Burlington (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.
Quick facts
- Permit required
- Yes source
- Fee
- $65 (1 and 2 family) source
- Side and rear yards
- 6 ft source
- Front (street) yard
- 4 ft if at least 80% open space; 3 ft if less than 80% open space; decorative fences up to 3 ft in a street yard source
- Corner lots
- Each street yard follows the front-yard rules; no fence in the vision clearance triangle (§ 315-46) source
- Distance from lot line
- Fences may be placed on or near property lines; in a front yard at least 3 ft from the street right-of-way. source
- Good side faces
- The finished or decorative side must face the adjoining property. source
- Not allowed
- Electrified fences, fences designed to shock, and fences with barbed wire or other harmful components (barbed wire allowed only in industrial districts at 10 ft+); fences of unsightly or dangerous materials. source
- How to apply
- In person source
Still being confirmed with Burlington: Can the fence permit application be emailed to the building inspector, and is there a downloadable form?
How to file for a fence permit in the City of Burlington
Steps based on zoneomics.com — Municipal code: chapter 5
- Get a fence permit application from the Building Inspector at City Hall, 300 N Pine Street (262-342-1161).
- Attach site drawings or a survey showing the fence location, plus its materials, height and design.
- In a historic district, get a certificate of appropriateness from the Historic Preservation Commission first.
- Pay the $65 fee and wait for approval; starting work without a permit doubles the fee.
- Call Diggers Hotline (811) at least 3 business days before digging.
- Paying
- $65 (1 and 2 family), fee set by the Common Council
- Review time
- Building Inspector approves fence materials; a denial can be appealed to the Zoning Board of Appeals
- Inspections
- Re-inspection fee $75
Who to contact
Jim Deluca
Building Inspection Services
- Phone
- 262-210-1741
- [email protected]
- Hours
- City Hall M-F 8 a.m.-4:30 p.m.
- Address
- Building Inspection, Burlington City Hall, 300 N Pine Street, Burlington, WI 53105
Contact from burlington-wi.gov — directory
What to submit
- Fence permit application to the Building Inspector
- Site drawings or a survey showing the fence location
- Fence materials, height and design
Other rules to know
- Historic districts: a fence needs an approved certificate of appropriateness from the Historic Preservation Commission.
- Height is measured from the ground to the top of the fence section, averaged between posts; the Building Inspector may require Plan Commission approval if posts/caps exceed the limit by more than 6 inches.
- Underground 'invisible' pet fences need no permit but must be at least 3 ft from all property lines. Temporary fences protecting plantings or construction hazards need no permit (generally up to 45 days).
- Altering more than 50% of an existing nonconforming fence requires bringing the whole fence into compliance.
- Fee schedule: "Work Started without permits Double Fee"; re-inspection fee $75.
- The city straddles Racine and Walworth counties; these rules apply citywide.
Before you dig
Call Diggers Hotline at 811 (or file online at diggershotline.com) at least 3 business days before digging post holes. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.
Frequently asked questions
Do I need a permit to build a fence in the City of Burlington, WI?
Yes. The City of Burlington requires a permit before you build a fence. Underground 'invisible' pet fences need no permit but must be at least 3 ft from all property lines. Temporary fences protecting plantings or construction hazards need no permit (generally up to 45 days).
How tall can a fence be in the City of Burlington?
Side and rear yards: 6 ft. Front (street) yard: 4 ft if at least 80% open space; 3 ft if less than 80% open space; decorative fences up to 3 ft in a street yard. Corner lots: Each street yard follows the front-yard rules; no fence in the vision clearance triangle (§ 315-46).
How close to the property line can I put a fence in the City of Burlington?
Fences may be placed on or near property lines; in a front yard at least 3 ft from the street right-of-way.
Which side of the fence has to face the neighbor in the City of Burlington?
The finished or decorative side must face the adjoining property.
How much is a fence permit in the City of Burlington?
$65 (1 and 2 family).
How do I apply for a fence permit in the City of Burlington?
Get a fence permit application from the Building Inspector at City Hall, 300 N Pine Street (262-342-1161). Attach site drawings or a survey showing the fence location, plus its materials, height and design. In a historic district, get a certificate of appropriateness from the Historic Preservation Commission first. Pay the $65 fee and wait for approval; starting work without a permit doubles the fee. Call Diggers Hotline (811) at least 3 business days before digging. permit.guide can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Burlington (site plan, aerial photo and filled-in details) in a few minutes.
Who do I contact about a fence permit in the City of Burlington?
Jim Deluca, Building Inspection Services. Phone 262-210-1741, email [email protected].
Sources
Summarized from the City of Burlington's own ordinances, forms and permit pages. Each link opens the original.
Ordinance: Zoning Code Ch. 315, § 315-51 Fences
Work for the City of Burlington? Help us keep this right