Independent guide. Not affiliated with any city, village, town or county.

permit.guide
Ozaukee County, Wisconsin

Village of Belgium fence permit

Do you need a fence permit in the Village of Belgium? Yes. The Village of Belgium requires a permit before you build a fence.

permit.guide can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Village of Belgium (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.

Quick facts

Permit required
Yes source
Side and rear yards
6 ft source
Front (street) yard
4 ft in the street yard source
Distance from lot line
Residential fences not closer than 2 ft to any public right-of-way or easement; may sit on side and rear lot lines if no easements run along those lines. source
Not allowed
Security fences are not allowed in residential districts. source
How to apply
Online portal, mail, in person source
Plan your fence and build the applicationLook up your address, draw the fence on an aerial photo of your lot, and get a site plan and filled-in application you can send to Village of Belgium.

How to file for a fence permit in the Village of Belgium

Steps based on belgiumwi.gov — aa3832 4606e798894b439ab9fd08edab75877d

  1. Apply online with the Village's Fence, Deck, or Pool Permit form (HeyGov), or fill out the paper building permit application and check "Fence".
  2. Attach three plats of survey showing where the fence goes and a color picture of an example of the fence.
  3. Submit online, bring it to Village Hall, 104 Peter Thein Ave, or mail it with a self-addressed stamped envelope.
  4. Expect about five working days for processing; pay the fee when the permit is issued.
  5. Request the Building Inspector's inspection through the Village's online "Contact Building Inspector / Request Inspection" form (or RK Inspections, 414-333-4511).
  6. Call Diggers Hotline (811) at least 3 business days before digging.
Paying
Permit is valid from the date of issuance and payment; fence fee amount not listed
Review time
About five working days
Inspections
All work must be inspected by the Building Inspector (RK Inspections, 414-333-4511)
Permit good for
One year from issuance and payment

Who to contact

Roger Kison
Building Inspector (RK Construction & Inspection Services, LLC)

Phone
414-333-4511
Address
Village Hall, 104 Peter Thein Ave, Belgium, WI 53004 (include a self-addressed stamped envelope if mailing)

Contact from belgiumwi.gov — aa3832 4606e798894b439ab9fd08edab75877d

What to submit

  • Village building permit application with "Fence" checked
  • Three plats of survey showing the fence placement
  • A color picture of an example of the fence

Official application form or packet

Village of Belgium online permit portal

Other rules to know

  • The Village lists "installing fencing of any length" as needing a permit.
  • Processing usually takes about five working days (longer in peak season).
  • All work must be inspected by the Building Inspector (RK Inspections).

Before you dig

Call Diggers Hotline at 811 (or file online at diggershotline.com) at least 3 business days before digging post holes. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.

Frequently asked questions

Do I need a permit to build a fence in the Village of Belgium, WI?

Yes. The Village of Belgium requires a permit before you build a fence.

How tall can a fence be in the Village of Belgium?

Side and rear yards: 6 ft. Front (street) yard: 4 ft in the street yard.

How close to the property line can I put a fence in the Village of Belgium?

Residential fences not closer than 2 ft to any public right-of-way or easement; may sit on side and rear lot lines if no easements run along those lines.

How do I apply for a fence permit in the Village of Belgium?

Apply online with the Village's Fence, Deck, or Pool Permit form (HeyGov), or fill out the paper building permit application and check "Fence". Attach three plats of survey showing where the fence goes and a color picture of an example of the fence. Submit online, bring it to Village Hall, 104 Peter Thein Ave, or mail it with a self-addressed stamped envelope. Expect about five working days for processing; pay the fee when the permit is issued. Request the Building Inspector's inspection through the Village's online "Contact Building Inspector / Request Inspection" form (or RK Inspections, 414-333-4511). permit.guide can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Village of Belgium (site plan, aerial photo and filled-in details) in a few minutes.

Who do I contact about a fence permit in the Village of Belgium?

Roger Kison, Building Inspector (RK Construction & Inspection Services, LLC). Phone 414-333-4511.

Sources

Summarized from the Village of Belgium's own ordinances, forms and permit pages. Each link opens the original.

Ordinance: Zoning Code § 270-53(C) (residential fences)

  1. belgiumwi.gov — building permits
  2. belgiumwi.gov — aa3832 4606e798894b439ab9fd08edab75877d
  3. belgiumwi.gov — aa3832 9aca407743a847ebbce72171692f4436
  4. zoneomics.com — Municipal code: chapter 7
  5. ecode360.com — Municipal code: index
  6. ecode360.com — Municipal code

Work for the Village of Belgium? Help us keep this right

If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.